Description
Brochures
Description

DESCRIPTION
This is the largest part of the facility providing 3 storey brick office building together with an adjoining 2 storey prefabricated office building which both wrap around a traditional steel portal frame industrial workshop unit. The brick office building was built in 1997 and provides the main reception facility which is security protected operating a swipe card system. A lift and stairs from the reception provide access to all floors. The offices provide a mix of open plan and cellular space with carpets, perimeter IT trunking (fed by a large Server room), suspended ceilings with inset lighting and air conditioning units

Floor Plan
Energy Performance Certificate
Video